Kaiha 2 Mini-Hydropower- RAP for 2.5 MW hydropower plant and transmission line

The Kaiha 2 Project is a project involved with the construction of a mini-hydropower plant, access road and associated infrastructure in Lofa County. Activities were spread out into five components: 1) construction of the Mini hydropowerplant and its sub-components; 2) construction of an access road to the hydro-power plant site (5.5km); 3) upgrade of existing 35Km road; 4) construction of a diesel power plant, and 5) construction of distribution lines for the distribution of electricity to the major receptor towns and cities.

Services Rendered:

RAP, household surveys, consultations, asset inventory. 

We developed a Resettlement Action Plan (RAP) for the  2.5 MW hydropower plant, 115 km transmission line, diesel backup plant, and associated access infrastructure in Lofa County Liberia. EEC conducted detailed household surveys, community consultations, and asset inventories to mitigate displacement and loss of livelihoods during construction.

Client: Rural & Renewable Energy Agency (RREA)

Funding Agency: Government of Norway, World Bank under the Liberia Renewable Energy Access Project (LIRENAP)